Implementation of Occupational Safety and Health Management System (SMK3) Through Lean Construction Method
Main Article Content
This study aims to analyze the implementation of building construction projects in the implementation of SMK3 using the Lean Construction (LC) method. The urgency of the study was to review the implementation of safe and correct work procedures in construction work projects carried out in building construction. The main purpose of implementing this method is to optimize financial operations, prevent loss of time, and minimize work accidents that result in waste through prevention efforts by considering various triggers as applied in the LC technique. The research method is carried out using a mixed-methods approach. The sample in the study includes 5 construction buildings, and 5 sources to obtain interview data. The LC implementation approach to SMK 3 is carried out through the 5S management system and the Last Planner System (LPS). The results of the study indicate that the planning carried out encompasses several aspects, including team socialization implementation. The results obtained were that construction projects carried out through the LC method, through the 5S management system approach, and LPS were proven to be able to optimize and make construction projects work effectively. The evaluation revealed that the evaluation process carried out by PT utilizes risk management and RIMS (Risk Management Plan), and has the potential to minimize the risk of loss and work-related accidents in construction projects.
Ali, A., Amin, M., & Husin, A. E. (2019). Key success factors for safety programs implementation in Indonesian construction projects. International Journal of Civil Engineering and Technology, 10(2), 1385–1394. https://doi.org/10.13140/RG.2.2.36301.49127
Bajjou, M. S., & Chafi, A. (2019). Lean construction and simulation for performance improvement?: a case study of reinforcement process. International Journal of Productivity and Performance Management, 2, 3–29. https://doi.org/10.1108/IJPPM-06-2019-0309
Carretero-gómez, J. M., Forteza, F. J., & Estudillo, B. (2023). Linking occupational accidents and construction firm survival. Journal of Safety Research, 10, 1–7. https://doi.org/10.1016/j.jsr.2023.05.002
Chandrayan, B., Solanki, A. K., & Sharma, R. (2019). Study of 5S lean technique: A review paper. International Journal of Productivity and Quality Management, 26(4), 469–491. https://doi.org/10.1504/IJPQM.2019.099625
Charismana, D. S., Retnawati, H., & Dhewantoro, H. N. S. (2022). Motivasi Belajar Dan Prestasi Belajar Pada Mata Pelajaran Ppkn Di Indonesia: Kajian Analisis Meta. Bhineka Tunggal Ika: Kajian Teori Dan Praktik Pendidikan PKn, 9(2), 99–113. https://doi.org/10.36706/jbti.v9i2.18333
Chiu, S., & Cousins, B. (2020). Last planner system® in design. Lean Construction Journal, 2020, 78–99.
Enshassi, A., & Saleh, N. (2019). Application level of lean construction techniques in reducing accidents in construction projects. Journal of Financial Management of Property and Construction, 21(3), 274–293. https://doi.org/10.1108/JFMPC-08-2018-0047
Enshassi, A., Saleh, N., & Mohamed, S. (2021). Barriers to the application of lean construction techniques concerning safety improvement in construction projects. International Journal of Construction Management, 21(10), 1044–1060. https://doi.org/10.1080/15623599.2019.1602583
Gao, M., Wu, X., Wang, Y. hui, & Yin, Y. (2023). Study on the mechanism of a lean construction safety planning and control system: An empirical analysis in China. Ain Shams Engineering Journal, 14(2), 101856. https://doi.org/10.1016/j.asej.2022.101856
John W. Creswell. (2017). Research Design Pendekatan Kualitatif, Kuantitatif, dan Mixed (VI). Pustaka Pelajar.
Karthik, S., & Silksonjohn, J. (2019). A case study of 5s implementation in inspection process. International Journal of Mechanical and Production Engineering Research and Development, 9(3), 1469–1476. https://doi.org/10.24247/ijmperdjun2019154
Kussumardianadewi, B. D., Husin, A. E., & Susianti, A. (2024). Analysis of Key Factors for Successful Implementation of the Last Planner System to Improve Time Performance on Dam Projects. Media Komunikasi Teknik Sipil, 29(2), 163–172. https://doi.org/10.14710/mkts.v29i2.49098
Mark, U., & El-Sayed Halim. (2015). Construction Supervision QC+HSE Management in Practice (3rd ed.). Libary of Congress.
Mesiono, M., Kesuma, W., Lestario, F., & Harahap, D. (2023). Manajemen Risiko di Perguruan Tinggi Swasta. Journal on Education, 5(3), 8402–8411. https://doi.org/10.31004/joe.v5i3.1626
Mohammadi, A., Igwe, C., Amador-jimenez, L., Nasiri, F., Mohammadi, A., Igwe, C., Amador-jimenez, L., & Nasiri, F. (2020). Applying lean construction principles in road maintenance planning and scheduling and scheduling. International Journal of Construction Management, 0(0), 1–11. https://doi.org/10.1080/15623599.2020.1788758
Mrozowska, A., & Mrozowski, P. (2019). How to improve safety on the offshore installations. TransNav, 13(2), 291–296. https://doi.org/10.12716/1001.13.02.04
Nai’em, M. F., Darwis, A. M., & Maksun, S. S. (2021). Trend analysis and projection of work accidents cases based on work shifts, workers age, and accident types. Gaceta Sanitaria, 35(51), S94–S97. https://doi.org/10.1016/j.gaceta.2020.12.026
Putra, S. jaya E., & Armada, A. (2023). Evaluasi Terhadap Implementasi Job Safety Analysis (Jsa) Dengan Job Safety Observation (Jso). Jurnal TeKLA, 5(1), 39. https://doi.org/10.35314/tekla.v5i1.3409
Radyawanto, A. S., & Soediantono, D. (2022). Literature Review of Integrated Management System ( IMAS ) and Implementation Suggestion in the Defense Industry Literature Review Integrated Management System ( IMAS ) dan Usulan Penerapannya Pada Industri Pertahanan. International Journal of Social and …, 3(3), 39–49.
Santurtún, A., & Shaman, J. (2023). Work accidents, climate change and COVID-19. Science of the Total Environment, 871(December), 1–6. https://doi.org/10.1016/j.scitotenv.2023.162129
Shaqour, E. N. (2022). The impact of adopting lean construction in Egypt: Level of knowledge, application, and benefits. Ain Shams Engineering Journal, 13(2), 2–11. https://doi.org/10.1016/j.asej.2021.07.005
Soraya, U., Husin, A. E., & Imron, A. (2024). Implementation of lean six sigma and last planner system method in station LRT project. AIP Conference Proceedings, 2710(1). https://doi.org/10.1063/5.0144549
Wu, X., Yuan, H., Wang, G., Li, S., & Wu, G. (2019). Impacts of lean construction on safety systems: A system dynamics approach. International Journal of Environmental Research and Public Health, 16(2), 2–16. https://doi.org/10.3390/ijerph16020221