Analysis of Risk Impact on Transportation Costs & Employee Performance
DOI:
https://doi.org/10.58344/locus.v4i5.4198Keywords:
Risk Management, Enterprise Risk Management, Fault Tree Analyst, Transportation, Distribution, Human ResourcesAbstract
Companies everywhere will face problems. Some of these problems are caused by internal and external problems of the Company. These problems can result in small or large losses to the Company. The instrument of this research is quantitative research with data study analysis, namely observation and literature study. In this study, the Fault Tree Analyst approach will be used. The application of this method begins with defining the problem, describing the graphical model, finding the minimum cut set, conducting a qualitative analysis, and conducting quantitative analysis. This research is a research development of the Enterprise Risk Management method. In previous research, using ERM only focused on identifying and evaluating risks through a qualitative approach based on the perception and experience of internal stakeholders on potential operational disruptions. However, this study develops this method by integrating a quantitative and systematic Fault Tree Analysis (FTA) approach in mapping the root causes of delivery inaccuracy. If in the ERM approach the risk is identified in general based on the probability-impact matrix, then in the FTA approach, the risk is further traced to the level of components and basic events, so as to be able to provide a more detailed picture of the contribution of each causative factor. The problems faced in this company focus on risk control related to the transportation of product delivery in this company. To strengthen the results of this study, the author added recommendations for proposed improvements. The results of the study using Fault Tree show that the dominant risks in this company are extreme distribution delays, work accidents that occur during work, and damage to transport vehicles. The problems in this study focus on risk control related to product delivery transportation.
References
Ahmad, R.S., Tuli, H. and Mahmud, M. (2022) ‘Penerapan Pengelolaan Persediaan Berdasarkan Sak Emkm Bagi Kelangsungan Usaha Mikro Di Kota Gorontalo’, Jurnal Ilmiah Manajemen dan Bisnis, 5(1), pp. 217–229. Available at: https://ejurnal.ung.ac.id/index.php/JIMB/article/view/14732%0Ahttps://ejurnal.ung.ac.id/index.php/JIMB/article/viewFile/14732/4473.
Dwiasnati, S. and Hidayat, R.R. (2022) ‘Penerapan Manajemen Risiko Menggunakan COSO: Enterprise Risk Management Framework Integrated Pada PT ALPHANET’, Jurnal Tata Kelola dan Kerangka Kerja Teknologi Informasi, 8(2), pp. 66–72. Available at: https://doi.org/10.34010/jtk3ti.v8i2.7845.
Hasan, N.N., Rahmadini, F. and Dariyah, D. (2021) ‘Application of Enterprise Risk Management to Banking Risk’, MIZANIA: Jurnal Ekonomi Dan Akuntansi, 1(2), pp. 67–84. Available at: https://doi.org/10.47776/mizania.v1i2.245.
Lubis, M.D.S. and Imsar (2022) ‘Analisis Manajemen Risiko Operasional Berdasarkan Pendekatan Enterprise Risk Management (Erm) Pada Ud. Anugrah Cabang Rantauprapat’, JMBI UNSRAT (Jurnal Ilmiah Manajemen Bisnis dan Inovasi Universitas Sam Ratulangi)., 9(3), pp. 1492–1504. Available at: https://doi.org/10.35794/jmbi.v9i3.44457.
Mellisa, Andono and 2013 (2013) ‘Penerapan Enterprise Risk Management Dalam Rangka Meningkatkan Efektifitas Kegiatan Operasional’, Jurnal Ilmiah Mahasiswa Universitas Surabaya, 2(1), pp. 1–15.
Safitri, S.A. and Rufaedah, Y. (2020) ‘Perancangan Enterprise Risk Management pada PerusahaanPeternakan (Studi Kasus pada PT Aretha Nusantara Farm)’, Industrial Research Workshop and National Seminar, pp. 26–27.
Badan Pusat Statistik. (2021). Ekspor Maret 2021 Mencapai US$18,35 Miliar dan Impor Maret 2021 senilai US$16,79 Miliar.
Hanafi, M. M. (2016). Manajemen Risiko. Yogyakarta: UPP STIM YKPN.
Hartati, M., & Nurainun, T. (2018). Analisis Risiko Rantai Pasok Pabrik Kelapa Sawit dengan Menggunakan Metode SCOR. Seminar Nasional Teknologi Informasi, Komunikasi dan Industri (SNTKI-10), 588-598.
University of Iowa.2009. Chapter 12: Boolean Algebra And Combinatorial Circuits Discrete Mathematical Structures: Theory And Applications. http://www.cs.uiowa.edu/~icurto/discret-ppt/Chapter 12.ppt.
R. R Moeler, “COSO Enterprise Risk Management Establishing Effective Governance, Risk, and Compliance Processes.” Second Edition Willey Corporate F& A. John Wiley & Sons, Inc. New Jersey, 2019.
A. Tunggal, Widjaja, “Internal Audit, Enterprise Risk Management dan Corporate Governance,” Jakarta: Harvarindo, 2020.
Mukhlisa*, S. a. (2018). Desain Sistem Manajemen Risiko pada Perguruan Tinggi Negeri Badan Hukum (PTN BH) Studi Kasus pada Universitas Gadjah Mada. Journal of Applied Accounting and Taxation Article History Vol. 3, No. 2, October 2018, 158-167 Received September, 2018 e-ISSN: 2548-9925 Accepted September, 2018 , 158-167.
Djuitaningsih, T. (n.d.). Efektivitas Enterprise Risk Management untuk Mencegah Terjadinya. p. 2. Retrieved September 25, 2021, from http://repository.bakrie.ac.id/1251/1/005.%20artikel%20Tita%20Djuitaningsih%20untuk %20Perpustakaan%20UB.pdf
Neni Purwati*1, H. W. (2021). Transformasi Layanan Administrasi Akademik Perguruan Tinggi di Masa Pandemi COVID-19 . JURNAL TEKNIKA ISSN: 0854-3143 e-ISSN: 2622- 3481 Teknika Vol. 15, No. 01, Juni 2021, 23 – 31 .
Iqbal, D.N. (2022) Analisis Keselamatan Dan Kesehatan Kerja Menggunakan Metode Failure Mode And Effect Analysis (FMEA) dan Fault Tree Analysis (FTA) (Studi Kasus:PTPN V Sei Galuh). Universitas Islam Negeri Sultan Syarif Kasim Riau.
Fithri, P., Nofriyanti, Hasan, A., & Kurnia, I. (2020). Risk Analysis for Occupational Safety and Health in Manufacturing Company Using FMEA and FTA Methods: A Case Study. IOP Conference Series: Materials Science and Engineering, 1003(1). https://doi.org/10.1088/1757-899X/1003/1/012073
Kambey, S. K., Malingkas, G. Y., Lefrandt, L. I. R., Wilayah, B., & Sulawesi, S. (n.d.). ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK BENDUNGAN LOLAK KAB. BOLAANG MONGONDOW, SULAWESI UTARA MENGGUNAKAN METODE FMEA (FAILURE MODE AND EFFECT ANALYSIS) DAN METODE DOMINO. In Jurnal Ilmiah Media Engineering (Vol. 12, Issue 2).
A. R. Yosaka and M. Basuki, “Analisa Risiko Pembangunan Barge Mounted Power Plant (BMPP) 60 MW di PT. PAL Indonesia (Persero) Menggunakan Metode Failure Mode and Effect Analysis (FMEA) dan Matrik Risiko,” J. Sumberd. Bumi Berkelanjutan, vol. 1, no. 1, pp. 476–492, 2022, doi: 10.31284/j.semitan.2022.3197.
F. I. Almaeda, “Penilaian Risiko Operasional Proses Pembangunan Kapal Wisata Trimaran Bottom Glass Menggunakan Metode Fault Tree Analysis dan Matrik Risiko Pada PT.ABC,” J. Sumberd. Bumi Berkelanjutan, vol. 1, no. 1, pp. 127–135, 2022, doi: 10.31284/j.semitan.2022.3082.
J. P. S. Irawan, I. D. Mustaniroh, dan S. Asmaul, “Model Analisis dan Strategi Mitigasi Risiko Produksi Keripik Tempe, Jurnal Teknologi dan Manajemen,” J. Teknol. Dan Manaj. Agroindustri, vol. 6, no. 2, hlm. 88–96, 2017.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Ramadani Al Mantinu Melia Eka Lestiani Saptono Kusdanu Waskito

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC-BY-SA). that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.