Analysis of Work Implementation Related to the Quality Management System on the Light Rail Transit (LRT) Phase 1B Project

sistem manajemen mutu Light Rail Transit SEM-PLS customer satisfaction index infrastruktur transportasi

Authors

November 5, 2025

Downloads

This study analyses the Implementation of the quality management system in the Light Rail Transit (LRT) Phase 1B project work on the Veledrome-Manggarai route spanning 6.4 km. The research employs Structural Equation Modeling-Partial Least Squares (SEM-PLS) and Customer Satisfaction Index (CSI) methods to analyze factors affecting quality management system implementation across four main work phases: borepile, pilecap, pier, and pierhead. Data were collected through structured questionnaires from 70 respondents comprising owners, contractors, and supervisory consultants. Results indicate that borepile work has the highest R² value (0.477), with material variables as the most dominant factor (path coefficient 0.294). The Fc 35Mpa concrete material indicator contributes most significantly (29%) to the quality management system. CSI analysis shows the highest stakeholder satisfaction level in pierhead work (90.88%) and lowest in pier work (79.78%). This research contributes to identifying critical factors in quality management systems for mass transportation infrastructure projects and provides a framework for quality performance evaluation in similar projects.