Analysis of the Selection of General Contract Conditions for Toll Projects in South Sumatra Province
Main Article Content
Toll road projects utilizing turnkey contract schemes, initially slated for completion between 2016 and 2019, experienced significant delays due to land unavailability and funding constraints. By 2019, construction progress on the Kayu Agung–Palembang–Betung (KAPALBETUNG) project had reached only 51%. To achieve functional targets, the project owner implemented a strategic policy to complete work up to Station 41+000 and construct a temporary toll exit, requiring an additional budget of approximately IDR 50 billion. The subsequent phase continued from late 2021 to 2023 under a single contract with the first phase but faced further complications from additional land acquisition, cost escalation, and schedule deviations. These conditions heightened the risk of construction disputes. This research aims to identify and formulate criteria and sub-criteria for dispute resolution using the Modified Delphi method and to determine the optimal contract alternative through the Preference Ranking Organization Method for Enrichment Evaluations (PROMETHEE). Data were collected via literature review and in-depth interviews and validated through five rounds of Modified Delphi. Results indicate the priority weights of criteria as Schedule (35.00%), Cost (32.22%), and Quality (32.78%). PROMETHEE analysis reveals that the NEC4 Engineering and Construction Contract (ECC) is the most optimal alternative for mitigating potential disputes. This study contributes to strategic decision-making in managing dispute risks within complex, dynamic construction projects.
Data Umum Proyek. (2025). Pembangunan Jembatan Musi, Kontrak Pembangunan Jalan tol Kayu Agung -- Palembang -- Betung Seksi 2 Paket III.2. Palembang.
Dika, H. (2020). Buku metode penelitian kualitatif dan kuantitatif. Yogyakarta: CV Pustaka Ilmu.
Eggleston, B. (2019). The NEC4 Engineering and Construction Contract: A commentary. John Wiley & Sons. https://doi.org/10.1002/9781119478737
Hardjomuljadi, S. (2010). Fidic Silver Book. LPJK & IKINDO.
INDONESIA, S. P. O. (2017). Challenges for tourism infrastructure development in West-Sumatra province of Indonesia. Technology, 8(10), 1009–1016.
Istiqomah, D. A., Suyanto, Y., & Priyanta, S. (2018). Sistem pendukung keputusan pemilihan peserta pelatihan menggunakan metode Modified Delphi, AHP dan PROMETHEE. Jurnal Berkala MIPA, 25(3), 1–12.
Kontrak Proyek. (2016). PT. Waskita Sriwijaya Tol, Kontrak Pembangunan Jalan tol Kayu Agung -- Palembang -- Betung Seksi 2 Paket III.2. Palembang.
Mahyuddin. (2021). Manajemen proyek konstruksi (Vol. VI). Yayasan Kita Menulis.
Mariyati, D. (2018). Prinsip hukum dalam penyusunan dan pelaksanaan kontrak Engineering Procurement Construction (Kontrak 'EPC'). Yuridika, 33(2), 188. https://doi.org/10.20473/ydk.v33i2.7412
Peraturan Lembaga Nomor 18 Tahun 2018 tentang Layanan Penyelesaian Sengketa Kontrak Pengadaan Barang/Jasa Pemerintah. (2018). Peraturan Menteri Dalam Negeri, BN.2018/NO.569.
Peraturan Pemerintah Nomor 29 Tahun 2000 tentang Penyelenggaraan Jasa Konstruksi. (2000). Pemerintah Pusat, LN.2000 No. 64, TLN No. 3956. https://peraturan.bpk.go.id/Details/53213/pp-no-29-tahun-2000
Poerdyatmono, B. (2007). Alternatif penyelesaian sengketa jasa konstruksi. Universitas Madura, 8(1).
Risalah Konsensus. (2025). Risalah wawancara mendalam, Kontrak Pembangunan Jalan tol Kayu Agung -- Palembang -- Betung Seksi 2 Paket III.2. Palembang.
Salim, W., & Negara, S. D. (2018). Infrastructure development under the Jokowi administration: Progress, challenges and policies. Journal of Southeast Asian Economies, 35(3), 386–401.
Sofyana, A. (2024). Analisis dampak positif dari penyelesaian sengketa konstruksi melalui jalur arbitrase pada kontraktor dan proyek konstruksi
Undang-undang Nomor 18 Tahun 1999 tentang Jasa Konstruksi. (1999). Pemerintah Pusat, LN.1999/NO.54, TLN NO.3833. https://peraturan.bpk.go.id/Download/26732/UU%20Nomor%2018%20Tahun%201999.pdf
Undang-undang Nomor 2 Tahun 2017 tentang Jasa Konstruksi. (2017). Pemerintah Pusat, LL SETNEG: 58 HLM.