Analysis of the Determinants of the Quality of Human Resources Project Management in Improving the Performance of Multi-Project Construction Time

Main Article Content

Rinaldy Novaria
Universitas Mercu Buana
Muhammad Isradi
Universitas Mercu Buana

Delays in construction project completion remain a major issue, particularly in multi-construction project environments characterized by limited resources and allocation conflicts. These conditions require high-quality project management human resources (HR) to ensure optimal project time performance. This study aims to analyze the effect of project management HR quality on time performance in multi-construction projects by examining five key dimensions: competence, loyalty, discipline, and integrity, with work motivation as a mediating variable. This study adopts a quantitative approach using the Structural Equation Modeling–Partial Least Squares (SEM-PLS) method with SmartPLS 4 software. Data were collected through questionnaire surveys involving respondents engaged in three construction projects managed simultaneously. In addition, Importance Performance Analysis (IPA) was applied to identify practical priority indicators for improvement. The results indicate that the research model demonstrates very strong predictive capability, with coefficients of determination (R²) of 0.933 for time performance and 0.874 for work motivation. All HR quality variables have a positive and significant effect on project time performance, with the dominant influence order being discipline, competence, work motivation, loyalty, and integrity. Work motivation is proven to act as a mediating variable that strengthens the influence of HR quality on time performance. The IPA results identify four priority improvement indicators: technical competence, discipline in standard operating procedures and working hours, accuracy in project time control, and social motivation along with work environment support. This study concludes that improving the quality of project management HR implementation—particularly in the aspects of discipline and competence supported by work motivation—is a key factor in achieving effective time performance control in multi-construction projects.


Keywords: Project Management, HR Quality, Time Performance, Multi Construction Project, Work Motivation
Akogbe, R. K. T. M., Feng, X., & Zhou, J. (2013). Importance and ranking evaluation of delay factors for development construction projects in Benin. KSCE Journal of Civil Engineering, 17(6), 1213–1222. https://doi.org/10.1007/s12205-013-0446-2
Ali, Z., Hussain, A., & Ahmed, Z. (2021). Breakdown in monitoring project performance to reduce transaction cost in public sector construction projects: A case study from pakistan. Research Journal of Social Sciences and Economics Review, 2(1), 414–427.
Arain, F. M., Pheng, L. S., & Assaf, S. A. (2006). Contractors’ Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia. Journal of Performance of Constructed Facilities, 20(1), 74–83. https://doi.org/10.1061/(asce)0887-3828(2006)20:1(74)
Covey, S. M. R., & Merrill, R. R. (2006). The speed of trust: The one thing that changes everything. Simon and schuster.
Do, S. T., Nguyen, V. T., & Nguyen, N. H. (2023). Relationship networks between variation orders and claims/disputes causes on construction project performance and stakeholder performance. Engineering, Construction and Architectural Management, 30(9), 3817–3839.
Ervianto, W. I. (2023). Manajemen proyek konstruksi. Penerbit Andi.
Hair, J. F., Risher, J. J., Sarstedt, M., & Ringle, C. M. (2019). The Results of PLS-SEM Article information.
Hartanto, D., & Wijaya, H. (2018). Faktor-faktor yang mempengaruhi earning response coefficient (ERC) dengan profitabilitas sebagai prediktor. Jurnal Paradigma Akuntansi, 1(2), 344–354.
Irfanto, R., & Salim, F. D. (2025). Analisis Tingkat Kebutuhan Pekerja Level Menengah Proyek Konstruksi (Studi Kasus: 3 Proyek Gedung di Jakarta Barat). Jurnal Komposit, 9(1), 93–100. https://doi.org/10.32832/komposit.v9i1.16135
Kerzner, H. (2009). A Systems Approach to Planning. John Wiley & Sons, Inc.
Maliha, M. N., Tayeh, B. A., & Abu Aisheh, Y. I. (2025). Impacts of Human Resources Management Strategies and Practices on Workers Performance in Construction Industry: a Review. Journal of Civil Engineering and Management, 31(1), 20–37. https://doi.org/10.3846/jcem.2024.20989
Maslow, A. H. (1943). A Theory of Human Motivation. JSTOR.
Meyer, J. P., & Allen, N. J. (1991). A Three-Component Conceptualization Of Organizational Commitment.
Nisa, T. F. A., Suyoso, H., & Sukmawati, S. (2022). Identifikasi Risiko Faktor Kualitas Sumber Daya Manusia Menggunakan Fault Tree Analysis Method Pada Pelaksanaan Pembangunan Bangunan Tinggi.
PMBOK. (2017).
Purwanti, D. R., Wardini, S. A., & Medeline, W. (2024). Jurnal Teknik Indonesia. 3, 1–10.
Rivai, V. (2016). Manajemen sumber daya manusia untuk perusahaan.
Robbins, S. P., & Judge, A. T. A. (2019). Organizational Behavior. 18th Edition. New York City, NY. USA: Pearson.
Seboka, D. A., & Gidebo, F. A. (2025). Investigating the effectiveness of contract administration at construction stage to averting substandard construction performance: in Shagar city public building projects. Journal of Asian Architecture and Building Engineering, 1–19.
Willy, Y., & Sekarsari, J. (2020). Analisis aspek sumber daya manusia terhadap kinerja pekerja proyek konstruksi. JMTS: Jurnal Mitra Teknik Sipil, 523–532.