Claim Submission Strategy for Jakarta Sewerage System Development Project Based on Standard Contract Management Body of Knowledge (CMBOK) Study Case PT.XYZ
Downloads
The implementation of construction work, particularly utility network installation, is generally required to comply with the provisions established in regulations stipulated by the local government. However, considering the actual conditions at the project site, several contractual clauses tend to be burdensome and cannot be fully complied with by the Contractor, thereby creating the potential for disputes and claims not only between the contracting parties but also among internal parties that had previously formed a Joint Venture. The highly complex and dynamic characteristics of construction work may increase potential risks related to cost and time and hinder the timely completion of the work. Therefore, an effective claim administration and documentation system is required to address these issues. This research aims to assist the Contractor in obtaining approval for claims related to additional costs and extensions of time as a means of mitigating the risk of claim rejection. The findings will subsequently be developed into a Standard Operating Procedure (SOP) for Joint Venture claim administration based on the Contract Management Body of Knowledge (CMBOK). Accordingly, this study employs a case study method to formulate strategic measures for minimizing claim rejection by analyzing the factors that predominantly contribute to claim disapproval, as identified in previous studies. By identifying the dominant risk factors in the implementation of the Joint Venture Integrated Project, the findings are expected to provide key measures for mitigating the risk of claim rejection.
Abdul-Rahman, H., Wang, C., Wood, L. C., & Ismail, S. (2014). International Joint Venture Between ASEAN and Gulf: Bidding and Delivering Bahrain International Formula-1 Circuit. TRAMES, 18(4), 357–382.
Ahmadisheykhsarmast, S., & Sönmez, R. (2020). A Smart Contract System for Security of Payment of Construction Contracts. Automation in Construction, 120, 103401. https://doi.org/10.1016/j.autcon.2020.103401
Almenar-Llongo, V., Muñoz de Prat, J., & Orero-Blat, M. (2021). Qualitative Analysis for Joint Ventures as an Entry Mode in Foreign Direct Investment. Journal of Business Research, 123, 324–332. https://doi.org/10.1016/j.jbusres.2020.09.062
Bakhary, N. A., Adnan, H., & Ibrahim, A. (2015). A Study of Construction Claim Management Problems in Malaysia. Procedia Economics and Finance, 23, 63–70. https://doi.org/10.1016/S2212-5671(15)00327-5
Bakhary, N. A., Adnan, H., Ibrahim, A., & Ismail, N. A. A. (2013). Critical Review on Improving the Claim Management Process in Malaysia. Journal of Education and Vocational Research, 4(7), 214–218. https://doi.org/10.22610/jevr.v4i7.122
Bashir, H., Musa, R., Al Zarooni, H. A., Ojiako, U., Haridy, S., & Shamsuzzaman, M. (2024). Social Sustainability in Action: An Explorative Study of Practices in Construction Project Management. Project Leadership and Society, 5, 100148. https://doi.org/10.1016/j.plas.2024.100148
Clough, R. H. (2004). Construction Contracting. John Wiley & Sons.
Cunningham, T. (2014). Contractors’ Claims for Loss and Expense under the Principle “Traditional” Forms of Irish Building Contract. Dublin Institute of Technology.
Dehkordi, A. M., & Nobari, N. (2015). Knowledge-Oriented in the Claim Management (Providing a documentation process model for claim management).
Famakin, I. O., Aje, I. O., & Ogunsemi, D. R. (2012). Assessment of Success Factors for Joint Venture Construction Projects in Nigeria. Journal of Financial Management of Property and Construction, 17(2), 153–165. https://doi.org/10.1108/13664381211246606
Girmscheid, G., & Brockmann, C. (2009). Inter- and Intraorganizational Trust in International Construction Joint Ventures. Journal of Construction Engineering and Management, 136(3). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000142
Klee, L., & Charles. (2013). Management of Contractor’s Claims in Construction Project.
Mohamed, H. H., Ibrahim, A. H., & Soliman, A. A. (2014). Reducing Construction Disputes through Effective Claims Management. American Journal of Civil Engineering and Architecture, 2(6), 186–196. https://doi.org/10.12691/ajcea-2-6-2
Multazam, M. (2019). Analysis of the Development of the Claim Administration and Documentation System in Construction Projects in the Form of a Non-Integrated Joint Venture.
Shakeri, E., Mousakhani, E., Amiri, S., & Ashori, T. (2014). Risk and Claim Management with Treaty Respects in Construction Contract.
Soliman, M. M. A. I. (2014). Risk Management in International Construction Joint Ventures in Egypt.
Tochaiwat, K., & Chovichien, V. (2006). Information System for Managing Employer’s Construction Claims. Chulalongkorn University.
Vaidya, S. (2017). Impact of Organizational Culture on Trust and Commitment in International Joint Ventures (IJVs): An Empirical Investigation.
Zhao, X., Hwang, B.-G., & Yu, G. S. (2013). Identifying the Critical Risks in Underground Rail International Construction Joint Ventures: Case Study of Singapore. International Journal of Project Management, 31(4), 554–566. https://doi.org/10.1016/j.ijproman.2012.10.014
Copyright (c) 2026 Jaliyul Masmaro, Parwadi Moengin

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC-BY-SA). that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.