Development of A Framework for Mitigating Cost and Time Overruns in The V25 Ambulance Ship Construction Project using The ISM and ANP Approaches
Downloads
This study aimed to develop a framework for mitigating cost and schedule overruns through the integration of Interpretive Structural Modeling (ISM) and the Analytic Network Process (ANP). Data were obtained from project documentation and questionnaires administered to five experts who assessed six factors and 23 internal subfactors contributing to cost and schedule deviations. ISM was used to analyze hierarchical relationships, driving power, and dependence power, while ANP was used to construct a priority network for nine subfactors in the independent quadrant. The final priorities were derived from five subfactors (A1–A5), while A6–A9 served as control nodes within the dependency relationships. The ISM results showed that unrealistic cost planning (A6) was positioned at the most fundamental level and had the highest driving power, identifying it as a key strategic driver. The ANP results indicated that inadequate communication and coordination among relevant parties (A1) had the highest global weight of 0.348180, followed by an insufficient number of workers (A2) at 0.258313 and excessive workload (A4) at 0.172153. The integration of the two methods indicated that A6 should be addressed during the planning stage, whereas A1 should be the primary operational priority during project implementation. This study developed a cyclical mitigation framework comprising priority risk identification, mitigation implementation, monitoring, effectiveness evaluation, residual risk assessment, and decision-making. The framework was supported by early mitigation measures, a Responsible, Accountable, Consulted, and Informed (RACI) matrix, monitoring indicators, evaluation frequency, and escalation mechanisms to strengthen cost and schedule control in similar shipbuilding projects.
Abdelalim, A. M., Salem, M., Salem, M., Al-Adwani, M., & Tantawy, M. (2025). Analyzing Cost Overrun Risks in Construction Projects: A Multi-Stakeholder Perspective Using Fuzzy Group Decision-Making and K-Means Clustering. Buildings, 15(3). https://doi.org/10.3390/buildings15030447
Adryani, A., Taufik, T. A., & Armono, H. D. (2024). Analysis of Cost Overrun & Time Overrun Causal Factors Affecting Construction Project Cost Performance Using Dematel & ANP. Dinasti International Journal of Economics, Finance & Accounting, 5(5). https://doi.org/10.38035/dijefa.v5i5.3613
Alhammadi, Y., Al-Mohammad, M. S., & Rahman, R. A. (2024). Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects. Buildings, 14(2). https://doi.org/10.3390/buildings14020487
Anandhi, B., & Mukilan, K. (2017). Analysis the Severity Factors of Time and Cost Overrun in Construction Projects. International Journal of Scientific Engineering and Research, 5(4). https://doi.org/10.70729/ijser151307
Arantes, A., & Ferreira, L. M. D. F. (2024). Development of delay mitigation measures in construction projects: a combined interpretative structural modeling and MICMAC analysis approach. Production Planning and Control, 35(10). https://doi.org/10.1080/09537287.2022.2163934
Ashtari, M. A., Ansari, R., Hassannayebi, E., & Jeong, J. (2022). Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach. Buildings, 12(10). https://doi.org/10.3390/buildings12101660
Chowdhury, N. A., Ali, S. M., Mahtab, Z., Rahman, T., Kabir, G., & Paul, S. K. (2019). A structural model for investigating the driving and dependence power of supply chain risks in the readymade garment industry. Journal of Retailing and Consumer Services, 51. https://doi.org/10.1016/j.jretconser.2019.05.024
Doloi, H. (2013). Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects. Journal of Construction Engineering and Management, 139(3). https://doi.org/10.1061/(asce)co.1943-7862.0000621
Dong, S., Ahmed, M., & Chatpattananan, V. (2025). Analysis of Key Factors of Cost Overrun in Construction Projects Based on Structural Equation Modeling. Sustainability (Switzerland), 17(5). https://doi.org/10.3390/su17052119
Ervianto, Wulfram, I. (2007). Manajemen Proyek Konstruksi - Edisi Revisi. PT. Gramedia Pustaka.
Gupta, C., & Kumar, C. (2020). Study of Factors Causing Cost and Time Overrun in Construction Projects. International Journal of Engineering Research & Technology (IJERT), 9.
Hadži?, N., Ložar, V., Opetuk, T., & Keser, R. (2023). Towards Digital Twinning of Fabrication Lines in Shipyards. Journal of Marine Science and Engineering, 11(5). https://doi.org/10.3390/jmse11051053
Hamidullah, M. A. Y., & Sucita, I. K. (2019). Analisis Penyebab Terjadinya Cost Overrun Pada Proyek Konstruksi Bangunan Gedung. Seminar Nasional Teknik Sipil Politeknik Jakarta.
Hassan, H., Mangare, J. B., & Pratasis, P. A. K. (2016). FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PADA PROYEK KONSTRUKSI DAN ALTERNATIF PENYELESAIANNYA (STUDI KASUS?: DI MANADO TOWN SQUARE III). Jurnal Sipil Statik, 4(11).
Helwande, M. V., Patil, Dr. Y., & Pallavi, Prof. (2023). Cost and Time Over Run in Construction Projects. International Journal for Research in Applied Science and Engineering Technology, 11(7). https://doi.org/10.22214/ijraset.2023.54703
Husin, A. E., & Sustiawan, F. (2021). Analisa RII (Relative Important Index) Terhadap Faktor-Faktor yang Berpengaruh dalam Mengimplementasikan BIM 4D dan M-PERT pada Pekerjaan Struktur Bangunan Hunian Bertingkat Tinggi. Jurnal Aplikasi Teknik Sipil, 19(4). https://doi.org/10.12962/j2579-891x.v19i4.9336
HUSSIEN, A. (2025). ENHANCING LABOR PRODUCTIVITY TO MITIGATE TIME AND COST OVERRUNS IN CONSTRUCTION PROJECTS. International Journal of Environmental Research and Earth Science. https://doi.org/10.70382/caijeres.v8i4.031
Johnson, R. M., & Babu, R. I. I. (2020). Time and cost overruns in the UAE construction industry: a critical analysis. International Journal of Construction Management, 20(5). https://doi.org/10.1080/15623599.2018.1484864
Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed., Ed.). John Wiley & Sons.
Leys, C., Ley, C., Klein, O., Bernard, P., & Licata, L. (2013). Detecting outliers: Do not use standard deviation around the mean, use absolute deviation around the median. Journal of Experimental Social Psychology, 49(4). https://doi.org/10.1016/j.jesp.2013.03.013
Limantoro, C., Andi, A., & Rahardjo, J. (2023). ANALISA FAKTOR COST OVERRUNS DENGAN METODE INTERPRETIVE STRUCTURAL MODELLING PADA BEBERAPA PROYEK KONSTRUKSI DI INDONESIA. Dimensi Utama Teknik Sipil, 10(1). https://doi.org/10.9744/duts.10.1.20-37
Magalhães, V. S. M., Ferreira, L. M. D. F., & Silva, C. (2021). Using a methodological approach to model causes of food loss and waste in fruit and vegetable supply chains. Journal of Cleaner Production, 283. https://doi.org/10.1016/j.jclepro.2020.124574
Marzangoushi, A., Mirjalili, A., & Dehghan Dehnavi, H. (2025). Utilizing a hybrid fuzzy DEMATEL-ANP-Delphi approach for identifying and prioritizing construction cost overruns in project management. Int. J. Nonlinear Anal. Appl, 16.
Molina-Gómez, J., Mercadé-Melé, P., Almeida-García, F., & Ruiz-Berrón, R. (2021). New perspectives on satisfaction and loyalty in festival tourism: The function of tangible and intangible attributes. PLOS ONE.
Nassar, A., & Elbisy, A. (2024). Evaluation of Factors Leading to Time Delays and Cost Overruns in Marine Construction Projects. Engineering, Technology and Applied Science Research, 14(5). https://doi.org/10.48084/etasr.8116
Copyright (c) 2026 Hamidah Zulfa Sarah, Silvianita Silvianita, Fitri Hardiyanti

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC-BY-SA). that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.