Strategy to Reduce the Main Cost of Electricity Supply in PT PLN Batam
Downloads
PT PLN Batam recorded a negative operating margin in 2024, as its electricity supply cost (Biaya Pokok Penyediaan, BPP) reached IDR 1,497/kWh, exceeding the average electricity selling price of IDR 1,462/kWh. This condition was primarily attributed to the heavy reliance on natural gas, which accounted for approximately 85% of the fuel mix, rising natural gas prices, and the absence of government subsidies or compensation. This study aimed to identify the primary factors contributing to the high electricity supply cost in the Batam power system and formulate strategies to reduce it. A quantitative case study approach was employed, incorporating cost-volume-profit (CVP) analysis to distinguish fixed and variable costs and determine the break-even point (BEP) for the 2020–2024 period. The analysis was complemented by an examination of the 2024 daily electricity load curve and a merit-order-based generation redispatch simulation. The findings revealed that variable costs, predominantly associated with natural gas consumption, accounted for up to 77.91% of operating expenses, while actual electricity sales in 2024 were 419.35 million kWh below the break-even sales volume. The simulation indicated that increasing the capacity factor of combined-cycle gas turbine (CCGT) power plants while reducing generation from gas engine power plants could lower the BPP to IDR 1,494/kWh, which remained above the average selling price. These findings demonstrated that operational efficiency improvements alone were insufficient to achieve financial sustainability. Therefore, government compensation mechanisms and long-term investments in solar photovoltaic (PV) generation integrated with battery energy storage systems (BESS), or the development of a Sumatra–Batam submarine power transmission cable, were identified as potential strategies for reducing electricity supply costs and improving the financial sustainability of PT PLN Batam.
Antweiler, Werner, & Muesgens, Felix. (2025). The new merit order: The viability of energy-only electricity markets with only intermittent renewable energy sources and grid-scale storage. Energy Economics, 145, 108439.
Arifin, Z. (2015). Fuel consumption for electricity power plant in Indonesia. M&E (Energy and Mineral Magazine), 13(2), 85–95.
Cao, Y., Wang, L., Jiang, S., Yang, W., Zeng, M., & Guo, X. (2020). Optimal operation of cold-heat-electricity multi-energy collaborative system. Global Energy Interconnection, 3(5), 430–441.
Daman, S. (2009). Electric power distribution system. Padang State University.
Damodaran, A. (2012). Investment valuation: Tools and techniques for determining the value of any asset. John Wiley & Sons, Inc.
Damodaran, A. (2015). Applied corporate finance (4th ed.). John Wiley & Sons, Inc.
Daniel, S. (2012). Developing a cost-volume-profit model in production decision system. Procedia Economics and Finance, 3, 350–354.
Kehlhofer, R., Hannemann, F., Stirnimann, F., & Rukes, B. (2009). Combined-cycle gas & steam turbine power plant (3rd ed.). PennWell Corporation.
Kimmel, P. D., Weygandt, J. J., & Kieso, D. E. (2013). Accounting: Tools for business decision making (5th ed.). John Wiley & Sons, Inc.
Ministry of Energy and Mineral Resources. (2025). Rencana Usaha Penyediaan Tenaga Listrik PT PLN Batam 2025–2034. Ministry of Energy and Mineral Resources.
Nag, P. K. (2008). Power plant engineering (3rd ed.). McGraw-Hill.
Nalbandian, H., & Sugden. (2016). Operation ratio and cost of coal power plant. USEA (United States Energy Association).
Nugroho, A. A., Haddin, M., & Kurniawan, M. A. R. (2018). Reconfiguration optimization of Tambak Lorok Semarang gas and steam power plant. In National Seminar Edusainstek FMIPA UNIMUS 2018. FMIPA UNIMUS.
PT PLN (Persero). (2024). Statistics PLN 2024. PT PLN (Persero).
PT PLN (Persero). (n.d.). PLN project document [Internal data]. PT PLN (Persero).
PT PLN Batam. (2024). Annual report 2024: Empowering reliability, driving sustainability. PT PLN Batam.
Purvin, A., Sereno, L., Ardelean, M., Covrig, C. F., Efthimiadis, T., & Minnebo. (2018). Submarine power cable between Europe and North America: A techno-economic analysis. Journal of Cleaner Production, 186, 131–145.
Raja, A. K., Srivastava, A. P., & Dwivedi, M. (2006). Power plant engineering. New Age International (P) Limited.
Stephen, W. F., & Patrick, D. R. (2009). Electrical power systems technology (3rd ed.). The Fairmont Press, Inc.
Stermole, F. J. (2000). Economic evaluation and investment decision methods. Investment Evaluations Corporation.
Sudaryono, Darmawati, S. S., Mujiyani, & Mulatsih. (2024). Cost Volume Profit (CVP) analysis in an effort to plan profits. AKSELERASI: National Scientific Journal, 6(2), 110–124.
Thommessen, C., Verheyen, J., Roes, J., & Hoster, H. (2025). Estimating the value of novel heat sources using a merit order approach. Applied Energy, 401, 126594.
Vinturella, J. B., & Erickson, S. M. (2009). Raising entrepreneurial capital (2nd ed.). Elsevier Inc.
Yuan, F.-C. (2009). The use of a fuzzy logic-based system in cost-volume-profit analysis under uncertainty. Expert Systems with Applications, 36, 1155–1163.
Copyright (c) 2026 Marudut Jon Ferry Simarmata, Oktofa Yudha Sudrajad

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC-BY-SA). that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.